The pilot considered not only nominal capacity but also workflow, microbiological assurance, occupational safety, cycle records, logistics and the quality of the treated material. The parties described the pilot as successful at the time.
A follow-up decision always requires site-specific validation and a documented waste route. Treatment does not automatically determine legal classification or final destination. Actual capacity, reductions and cost benefits depend on composition, loading, operating conditions and the existing route.
SimpleComply connects this technical assessment to waste-stream analysis, the business case, purchase or leasing, installation, training, maintenance, permit support and post-treatment separation.
